Completage

Interior specification built from suppliers’ live stock

Not a catalogue. Only what is physically on a warehouse shelf today, or arriving within a short lead time — with the quantity, the warehouse, and the date the supplier last updated it himself.

The demo is open, no password needed. Its data is fictional: no live supplier price list is in the system yet.

01 · The problem

A designer specifies an interior from supplier catalogues. By the time the client approves it, half the items turn out to be three-month special orders or discontinued. The schedule slips and the budget is rewritten.

02 · What Completage does

  1. 01Takes a request in plain words and photographs: “a three-metre sofa for the living room, fabric like the picture”.
  2. 02Matches it against real inventory: quantity, warehouse, and the date the supplier updated it.
  3. 03States delivery as a number — “14 days” — never as “made to order”.
  4. 04Produces a specification in PDF and Excel, and holds the items for 48 hours while the client decides.

Product parameters

48

hours an item stays on hold

14

days — the short lead time threshold; 30 for upholstered furniture

7

days — freshness window: older data is excluded from results

20

supply-schedule categories: the numbered delivery plan an interior project is built around, from tiling to curtains

These are product parameters, not business metrics — the project has no revenue, customers or partners yet. It starts in Russia, Moscow first: prices, stock and lead times come from Russian suppliers and are shown in roubles, written with a comma as the thousands separator (₽ 120,000).

03 · What already works

The state of the build on 16 August 2026, with nothing rounded in our favour. Covered by 26 end-to-end checks and 154 unit tests.

Working

  • Supplier price-list intakeAn Excel template, parsing and normalisation. Rows that fail are rejected with a stated reason rather than lost silently.
  • Manual review of new valuesAn unfamiliar word from a supplier goes into a queue and is accepted by a person. Automatic acceptance is deliberately refused: it would turn one fabric into three separate filter entries.
  • Search with request parsingCategory, dimensions and materials are read out of a single line. A refinement is never allowed to empty the results: we show the nearest match and say plainly what could not be met.
  • Lead time filterIn stock and short lead time by default; long lead times only when the user asks for them.
  • Furnishing package for a room“Bathroom” or “96 m² flat” is broken down across supply-schedule categories, with quantities calculated from the area.
  • 48-hour holdStock is checked inside a transaction: if it is short, nothing is held at all.
  • Specification exportExcel with live formulas and PDF in the brand typeface.
  • Designer accountPhone login without a password, projects, saved selections with a snapshot and a recalculation of what has changed since.

Working, on a stub

  • SMS loginThe login flow is finished, but there is no contract with an operator yet: the confirmation code appears on screen instead of arriving as a message.
  • Commission contractsSigning by code works, with a snapshot of the text and its hash; the database refuses to alter a signed document. The contract wording and the withholding rates are a draft — no lawyer or accountant has confirmed them.
  • Attribute sets per categoryThree are verified against the market and fed by intake: tile, engineered board, furniture. Sanitary ware and lighting still run on demo data only.

Not built

  • Photo understandingAn image is accepted, stored and shown to the person, but it does not feed the matching. No model has been chosen.
  • Intake through a supplier APIThe second channel into 1C and ERP systems is planned and not started: today stock arrives as a file.
  • Showing the selection in the roomBroken down into three levels of difficulty; none of them is in the coming release.
  • Live suppliersNot one connected supplier and not one deal. Everything visible in the demo is invented data.

04 · How the business earns

  • Commission on a completed saleA percentage of a deal that went through the service. No warehouse, no logistics, no stock bought onto our own balance sheet — and none planned.
  • The client pays the supplier directlyMoney does not pass through us. What happens on our side is registration of the order: without a registered hold the commission cannot be proven, and that is load-bearing rather than paperwork.
  • Price parity with the supplierWe never undercut his own channel. A supplier whose direct sales we take will close the data exchange the next morning, and the data is the product.
  • The designer’s commission is paid by the supplierWe are not the source of the payment. Our part is to register the deal and show three figures rather than one: accrued, withheld, payable.
  • What accumulatesAs suppliers connect, the system builds something none of them has on his own: a normalised, dated picture of what is actually available across the market at the moment a designer is choosing.

05 · Why now

The stock exists and changes daily. It simply sits inside 1C — the accounting system almost every Russian supplier runs — and inside price lists a sales manager e-mails on request. At the moment of choice the designer cannot see any of it, so he chooses from a catalogue that knows nothing about the warehouse.

Whoever makes the shelf visible at that moment stands where the deal is already assembled: the commission is taken on a finished decision, without owning inventory. For the supplier the incentive is exactly as strong as his incentive to sell what is already lying in his warehouse.

There is no market sizing on this page. We have not measured it ourselves, and borrowed figures in an investor conversation are a bad sign.